Optima Water Solutions is a Containerised STP Manufacturer in Gurgaon. Our factory-assembled, pre-commissioned Containerised Sewage Treatment Plant units come installed in standard 20-ft or 40-ft containers for rapid deployment at construction sites, remote locations, mining operations, defence establishments, and temporary townships. ISO 9001:2015 certified, with a plug-and-play design that needs no civil work.
A Containerised Sewage Treatment Plant (CSTP) is a complete STP system factory-assembled inside a standard ISO shipping container — including all equipment, pipework, electrical panels, blowers, and controls. The unit is delivered to site, connected to inlet/outlet pipes and power supply, and is operational within 1–2 days.
Unlike conventional civil-based STPs that require months of construction, containerised STPs are ideal for situations requiring rapid deployment, temporary installations, or remote locations where civil construction is impractical or uneconomical.
Container STPs use proven biological treatment technologies — MBBR (Moving Bed Biofilm Reactor) or SBR (Sequencing Batch Reactor) — and comply with all CPCB discharge standards.
Gurgaon's ongoing high-rise and corporate campus construction across Golf Course Extension Road and Sohna Road generates steady demand for containerised STP as an interim solution during construction phases, common practice given the pace of development here.
IMT Manesar's manufacturing expansions also use containerised units for temporary staff facility needs.
Key industrial areas we serve in Gurgaon:
Population equivalent, flow rate, site access, power availability, inlet/outlet connection points.
20-ft or 40-ft container selection. Equipment layout. Ventilation and access design.
Complete system assembled, tested, and commissioned at factory before dispatch. No surprises on site.
Crane placement. Inlet/outlet pipe connections. Power connection. Operational within 24–48 hours.
Construction Sites
Mining Operations
Defence & Army
Remote Facilities
Temporary Townships
Events & Exhibitions
Disaster Relief
Railway Stations
Get a free site visit and custom proposal from our engineers within 48 hours. ISO 9001:2015 certified. 158+ projects delivered across India.
Yes, given the pace of development along Golf Course Extension Road and Sohna Road, treating labour camp and site office sewage during construction is one of our most common Gurgaon project types.
Cost typically runs ₹8 Lakh to ₹40 Lakh depending on capacity. Call +91 9711880791 for a project-specific quote.
Yes, this is a practical option for temporary staff facility sewage treatment during expansion without disrupting the operating plant's main infrastructure.
Given our Delhi-based team's proximity, typically 3 weeks from order confirmation.