Water Solution – One Call Ahead
Water Solution – One Call Ahead
Enquire? Send Your Mail
Optima Water Solutions is an ETP Plant Manufacturer in Faridabad. We handle Effluent Treatment Plant design, manufacturing, installation, and maintenance end to end. Our ISO 9001:2015 certified systems meet Haryana Pollution Control Board discharge norms, helping industries in Faridabad avoid penalties and operate sustainably. With 158+ installations across India, our ETP solutions serve textile, pharmaceutical, chemical, food processing, and other industries.
An Effluent Treatment Plant (ETP) is an industrial wastewater treatment system designed to remove pollutants, heavy metals, toxic chemicals, and organic matter from industrial effluent before it is discharged into the environment or reused in the manufacturing process.
Unlike domestic sewage treatment, ETP systems must be customised to the specific effluent characteristics of each industry. Common technologies include physico-chemical treatment (coagulation, flocculation, clarification), biological treatment (aerobic/anaerobic), advanced oxidation, and membrane filtration.
The Water (Prevention and Control of Pollution) Act and CPCB norms make ETPs legally mandatory for all major industries in India. Non-compliance results in penalties, factory closure, and criminal liability for directors.
Faridabad's manufacturing base has grown alongside stricter Haryana Pollution Control Board enforcement, and ETP compliance is now checked routinely rather than only at initial licensing. Around Sector 24-25 Industrial, Sector 58-59 Industrial, NIT Faridabad Industrial, retrofitting treatment after an inspection notice costs more than designing it in from the start — HSPCB inspection in this belt has become more consistent in recent years.
For Faridabad clients, we handle ETP design, manufacturing, installation, and ongoing AMC support as one contract, with the treatment train matched to the client's specific manufacturing process rather than a generic industrial template.
Key industrial areas we serve in Faridabad:
Most ETP projects we deliver in Faridabad fall in the 5 KLD to 5 MLD range, though the right treatment train depends far more on what the unit produces than on volume alone. General manufacturing and assembly units typically need standard biological treatment for organic-load effluent, while units involved in metal finishing, chemical processing, or dyeing need additional pre-treatment stages for the specific contaminants their process generates.
We recommend a site visit and process review before finalising a design for any Faridabad project, since effluent characteristics vary significantly even between units in the same industrial estate.
Collect effluent samples. Lab analysis of BOD, COD, TSS, heavy metals, pH. Custom ETP design for your industry.
Detailed engineering drawings. In-house fabrication of tanks, reactors, and equipment. Quality testing at factory.
Site installation by expert team. Civil coordination. Full commissioning with SPCB compliance verification.
Operator training for your team. Annual Maintenance Contracts. Documentation for SPCB renewal applications.
Textile Industry
Pharmaceutical
Chemical Industry
Food & Beverage
Electroplating
Tannery & Leather
Paper & Pulp
Paint Manufacturing
Get a free site visit and custom proposal from our engineers within 48 hours. ISO 9001:2015 certified. 158+ projects delivered across India.
Budget depends on your manufacturing process and effluent characteristics. Standard industrial units generally start around ₹8-12 Lakh, scaling up significantly for units needing specialised pre-treatment. We provide a detailed quote after reviewing your process — call +91 9711880791.
Most do, particularly those above a certain discharge volume or in chemical, metal-finishing, or processing categories. The Haryana Pollution Control Board sets the applicable threshold, and we can confirm whether your specific unit qualifies.
It depends on your specific process — general manufacturing units typically do well with standard biological treatment, while units with metal, chemical, or colour contamination need dedicated pre-treatment stages first. We assess your process before recommending a design.
Most standard systems are installed and commissioned in 4 to 8 weeks from order confirmation. Units requiring specialised pre-treatment for their specific process may need a longer design and installation timeline.
Yes. Our AMC packages for Faridabad clients cover routine servicing, spare parts, and breakdown response, helping the plant maintain compliance with CPCB and Haryana board standards after commissioning.
Our engineers in Faridabad are available for a free site visit and assessment.