Water Solution – One Call Ahead

Enquire? Send Your Mail

Optima Water Solutions supplies and installs Electrodeionization (EDI) Systems in Assam for ultrapure water production used in pharmaceutical, semiconductor, power, and high-purity chemical manufacturing. Our ISO 9001:2015 certified EDI systems eliminate the need for chemical regeneration, producing consistently high-purity water (resistivity 10–18 MΩ·cm) with minimal environmental impact.

158+ Projects Completed
12+ Years Experience
ISO 9001:2015 Certified
100 LPH to 50 m³/hr Capacity Range

What is a EDI Systems?

Electrodeionization (EDI) is a continuous electrochemical ion exchange process that uses ion exchange membranes, resins, and a DC electric current to remove dissolved ionics from water — producing ultrapure water without the chemical regeneration required by conventional ion exchange (DM plant) systems.

EDI operates as a polishing step after Reverse Osmosis (RO) to produce high-purity water meeting USP Purified Water, ASTM Type I/II, and semiconductor grade specifications. Output water typically has resistivity of 10–18 MΩ·cm and TDS below 0.1 ppm.

Key advantages over conventional DM plants: no acid/alkali regeneration chemicals, continuous 24/7 operation, consistent output quality, and lower hazardous waste.

EDI Systems in Assam — Why It Matters

Facilities operating near Amingaon Industrial Estate, Bongaigaon Petrochemical, Dibrugarh Industrial in Assam face close scrutiny over wastewater discharge. Assam Pollution Control Board (APCB) enforces effluent norms. Tea, petrochemical, and paper industries face strict ETP requirements. STPs mandatory for large hotels and commercial complexes in Guwahati.

Optima Water Solutions has built a track record of EDI installations serving Assam and the surrounding area, with local support for commissioning, operator training, and ongoing maintenance.

Key industrial areas we serve in Assam:

Amingaon Industrial Estate Bongaigaon Petrochemical Dibrugarh Industrial Tinsukia Industrial Area ASTC Industrial Estate
Regulatory Note: Assam Pollution Control Board (APCB) enforces effluent norms. Tea, petrochemical, and paper industries face strict ETP requirements. STPs mandatory for large hotels and commercial complexes in Guwahati.

Our 4-Step Process — From Design to Handover

1

Feed Water Analysis

RO permeate quality analysis — conductivity, silica, CO2. EDI module selection and stack design.

2

System Engineering

EDI module array design. Pre-treatment requirements — degasser, polisher. Control system design.

3

Supply & Integration

EDI modules from leading manufacturers (SnowPure, Siemens, GE). Integration with existing RO system.

4

Commissioning & Validation

Performance qualification (PQ). USP/ASTM water quality testing. IQ/OQ/PQ documentation for pharma clients.

Why Choose Optima Water Solutions

  • Chemical-free operation — no acid, caustic, or salt regeneration required
  • Continuous 24/7 operation — no downtime for regeneration cycles
  • Consistent ultrapure water quality — resistivity 10–18 MΩ·cm
  • USP Purified Water and WFI-grade output for pharmaceutical applications
  • Lower lifecycle cost than conventional DM plant with chemical costs eliminated
  • Safe operation — no chemical handling, storage, or neutralisation pit required
  • Compact installation — modular EDI stacks, small footprint
  • SCADA integration — continuous quality monitoring, alerts
  • IQ/OQ/PQ validation documentation for GMP pharmaceutical facilities
  • AMC and module replacement services available in {city}

Industries & Applications in Assam

Pharmaceutical (USP PW)

Semiconductor Mfg

Power Plant Boiler

Electronics Mfg

Laboratory Water

Chemical Manufacturing

Solar Cell Production

Medical Devices

Need a EDI Systems in Assam?

Get a free site visit and custom proposal from our engineers within 48 hours. ISO 9001:2015 certified. 158+ projects delivered across India.

Common Questions

EDI Systems in Assam — FAQ

What is the cost of an EDI System in Assam?

EDI system cost in Assam depends on capacity and application. A 100 LPH pharmaceutical EDI system starts from ₹5–8 Lakh. A 1 m³/hr industrial EDI costs ₹15–25 Lakh. Large 10 m³/hr systems for power or semiconductor use range ₹80 Lakh to ₹2 Crore. Call +91 9711880791 for specifications and pricing.

What is the difference between EDI and DM Plant?

A DM (Demineralisation) plant uses cation and anion exchange resins regenerated periodically with HCl and NaOH. EDI uses continuous electrochemical regeneration — no chemicals needed, no downtime for regeneration, consistent output quality. EDI produces higher purity water (10–18 MΩ·cm vs 1–5 MΩ·cm for DM) with lower long-term operating costs.

Does EDI meet USP Purified Water requirements?

Yes. A properly designed RO + EDI system consistently meets USP Purified Water specifications — conductivity below 1.3 µS/cm at 25°C, TOC below 500 ppb, and microbial limits. Optima provides full IQ/OQ/PQ validation documentation for pharmaceutical EDI installations in Assam.

What pre-treatment does EDI require?

EDI requires RO permeate as feedwater — typically RO output with conductivity below 30 µS/cm. Free chlorine must be absent (use activated carbon or sodium bisulphite dosing). CO2 should be removed using a degasser. Hardness must be below 1 ppm. Proper pre-treatment ensures EDI module life exceeds 5–7 years.

Can you retrofit EDI to an existing RO system in Assam?

Yes. If you have an existing RO system in Assam, Optima can add an EDI polishing module to upgrade output water quality to ultrapure standards. We assess your existing RO output quality and design the EDI integration — including any additional pre-treatment needed before the EDI module.

Ready to Start?

Our engineers in Assam are available for a free site visit and assessment.

Call Us +91 97118 80791 WhatsApp +91 97118 80791