Optima Water Solutions is a ZLD Plant Supplier in Coimbatore. We design and install Zero Liquid Discharge (ZLD) Plants that eliminate liquid effluent discharge completely. ZLD is mandatory for textile, distillery, sugar, tannery, and other industries under CPCB norms. Our ISO 9001:2015 certified systems combine membrane technology with thermal evaporation to recover maximum water and produce only dry solid waste.
Zero Liquid Discharge (ZLD) is a water treatment process in which all wastewater is treated and recycled — no liquid effluent is discharged to the environment. The process concentrates all dissolved salts and contaminants into a dry solid (cake) that can be safely disposed of or further processed.
A complete ZLD system typically combines: Effluent Treatment Plant (ETP) → Reverse Osmosis (RO) → Multiple Effect Evaporation (MEE) or Mechanical Vapour Recompression (MVR) → Agitated Thin Film Dryer (ATFD) or Spray Dryer.
The CPCB and State PCBs have mandated ZLD for highly polluting industries including textile dyeing, distilleries, sugar mills, tanneries, and pharmaceutical bulk drug manufacturing units across India.
ZLD demand in Coimbatore concentrates in its textile-dyeing sector, following the same TNPCB requirements we see across Tamil Nadu's other textile centres, while the city's substantial engineering and pump-manufacturing base generally doesn't need it.
This makes Coimbatore's ZLD demand narrower but still significant within its specific textile-processing segment.
Key industrial areas we serve in Coimbatore:
Detailed lab analysis. TDS, COD, BOD, heavy metals, conductivity. Treatability study to determine optimal ZLD train.
ETP + RO + MEE/MVR + ATFD configuration. Mass and energy balance. Detailed engineering package.
In-house fabricated ETP and RO components. MEE/ATFD from specialist partners. Full project management.
Performance testing to SPCB satisfaction. Documentation for ZLD compliance certificate. Operator training.
Textile Dyeing
Distillery
Sugar Mill
Tannery
Pharmaceutical
Chemical Plant
Paper & Pulp
Power Plant
Get a free site visit and custom proposal from our engineers within 48 hours. ISO 9001:2015 certified. 158+ projects delivered across India.
Many do, under TNPCB's zero liquid discharge requirements, similar to other Tamil Nadu textile centres. We confirm the applicable requirement for your specific unit during the site assessment.
Given the multi-stage treatment textile-dyeing effluent requires, cost typically runs ₹50 Lakh to over ₹2.2 Crore. Call +91 9711880791 for an assessment specific to your process.
Generally no — this sector's effluent profile is much simpler and doesn't require the zero-discharge treatment textile-dyeing units need.
We apply the same colour-removal and recovery-stage design principles we use across Tamil Nadu's textile centres, adjusted to each unit's specific dyeing process.
Our engineers in Coimbatore are available for a free site visit and assessment.