Water Solution – One Call Ahead
Water Solution – One Call Ahead
Enquire? Send Your Mail
Optima Water Solutions is a Containerised STP Manufacturer in Chennai. Our factory-assembled, pre-commissioned Containerised Sewage Treatment Plant units come installed in standard 20-ft or 40-ft containers for rapid deployment at construction sites, remote locations, mining operations, defence establishments, and temporary townships. ISO 9001:2015 certified, with a plug-and-play design that needs no civil work.
A Containerised Sewage Treatment Plant (CSTP) is a complete STP system factory-assembled inside a standard ISO shipping container — including all equipment, pipework, electrical panels, blowers, and controls. The unit is delivered to site, connected to inlet/outlet pipes and power supply, and is operational within 1–2 days.
Unlike conventional civil-based STPs that require months of construction, containerised STPs are ideal for situations requiring rapid deployment, temporary installations, or remote locations where civil construction is impractical or uneconomical.
Container STPs use proven biological treatment technologies — MBBR (Moving Bed Biofilm Reactor) or SBR (Sequencing Batch Reactor) — and comply with all CPCB discharge standards.
Chennai's SIPCOT Sriperumbudur expansion and ongoing IT campus construction generate steady demand for containerised STP as an interim or space-constrained solution, particularly for sites with limited land for a conventional treatment yard.
Coastal construction sites also favour containerised units given the reduced civil work required compared to a below-ground system.
Key industrial areas we serve in Chennai:
Population equivalent, flow rate, site access, power availability, inlet/outlet connection points.
20-ft or 40-ft container selection. Equipment layout. Ventilation and access design.
Complete system assembled, tested, and commissioned at factory before dispatch. No surprises on site.
Crane placement. Inlet/outlet pipe connections. Power connection. Operational within 24–48 hours.
Construction Sites
Mining Operations
Defence & Army
Remote Facilities
Temporary Townships
Events & Exhibitions
Disaster Relief
Railway Stations
Get a free site visit and custom proposal from our engineers within 48 hours. ISO 9001:2015 certified. 158+ projects delivered across India.
Yes, particularly for treating sewage during plant construction phases before permanent infrastructure is ready, which is a common request from SIPCOT Sriperumbudur clients.
Cost typically runs ₹8 Lakh to ₹42 Lakh depending on capacity. Call +91 9711880791 for a project-specific quote.
Yes, since it needs less civil work than a below-ground system, which is often preferable on coastal sites with challenging soil or water table conditions.
Typically 3-5 weeks from order confirmation, depending on capacity and site access.
Our engineers in Chennai are available for a free site visit and assessment.